Temporary Power & Distribution Rental for Facility

 

When construction wrapped on a new large-scale distribution facility, permanent utility power wasn’t ready. With operations scheduled to begin immediately, downtime was not an option. The facility turned to Garrett McKenzie for a fast, scalable temporary power rental solution.

 

 

 

The Challenge

  • Facility located 900+ miles from our main depot
  • Power required within 3 days (over a weekend)
  • A massive property requiring extensive mobilization and setup
  • Waiting for the utility company would have meant delays and lost revenue. The customer needed a trusted partner to step in quickly with a complete solution.

 

 

The Response

After several planning calls, the facility was confident in Garrett McKenzie’s ability to deliver. Late Friday, the call came in: power needed to be fully operational by Monday morning.

Our team immediately mobilized generators, cabling, and accessories. Delivery was coordinated with support vehicles, a semi truck and trailer, and a 30-ton crane for staging. Technicians worked around the clock through Saturday and Sunday to install and test all equipment.

The Execution

In under 60 hours, Garrett McKenzie:

  • Delivered 7 Megawatts of temporary power
  • Installed 20,000 feet of cable
  • Completed setup, installation, and testing before Monday morning
  • This rapid deployment ensured the facility could open on schedule without costly downtime.

 

 

Equipment Delivered

  • 1 × 2,000 kW generator
  • 1 × 1,150 kW generator
  • 1 × 1,000 kW generator
  • 2 × 560 kW generators
  • 2 × 500 kW generators
  • 1 × 400 kW generator
  • 1 × 330 kW generator
  • Power distribution cable (20,000 feet)
  • Cable ramps & accessories

 

Logistics & Field Support

  • Equipment sizing, installation, and full management
  • 30-ton crane for generator placement
  • Semi truck & trailer, plus two service vehicles
  • Onsite technicians providing setup and breakdown

The Result

By Monday morning, the distribution facility had full power, keeping its timeline intact. The successful mobilization highlighted Garrett McKenzie’s ability to respond quickly, scale effectively, and deliver reliable temporary power solutions nationwide.

“7 Megawatts of power and 20,000 feet of cable installed in under 60 hours.”

 

Why Choose Garrett McKenzie?

  • Nationwide coverage with rapid response
  • Generators up to 2,000 kW with scalable options
  • Power distribution, ATS, transformers, and fuel tanks
  • 24/7/365 emergency response
  • Experienced onsite technicians who deliver results

Ready to Keep Your Projects Powered and on Track?

When your next commercial or industrial project requires professional grade power and distribution, trust Garrett McKenzie to keep you energized.

👉 Contact us today at 877-469-1600 or rentals@garrettmckenzie.com.