When an industrial facility in Northern Illinois needed additional power to support new equipment, waiting for a permanent electrical upgrade was not an option. The operations team required a fast rental solution that could support both immediate and long-term needs. Garrett McKenzie supplied the power, service, and flexibility needed to keep production moving smoothly.
The Situation
A growing industrial facility needed more electrical capacity to operate new equipment. A permanent infrastructure upgrade would take months, so the team searched for a reliable temporary power plan that could meet current loads and adapt to future demands.
The facility contacted Garrett McKenzie for a scalable power rental that could support continuous operation and provide dependable service for the long term.
The Response
Working closely with the operations team, Garrett McKenzie proposed generator options and service plans that matched the facility’s immediate requirements and possible future needs.
The first generator delivered was a 56 kW unit, which supported early equipment loads. As the facility expanded and production increased, the customer requested more power. A 120 kW generator was then delivered, helping support the next phase of their operation.
The Execution
The 56 kW generator was delivered, connected to the customer’s equipment, and placed under a maintenance and monitoring plan.
As the customer added new machinery months later, Garrett McKenzie delivered a second generator, a 120 kW unit. The same installation, testing, and service protocols were applied to keep performance steady. Field technicians visited the site regularly, performed preventive service, and monitored output to support long-term operation.
The Result
The 120 kW generator remains on site today, providing stable power for the facility’s expanding operations. Garrett McKenzie continues to deliver preventive maintenance, regular monitoring, and on-call service as needed.
The customer values the flexibility of a scalable rental solution that grows with their operational changes and avoids the delays related to permanent electrical upgrades.